Crowne Plaza & Holiday Inn Express Hotel T4

1

The WBS Group, celebrates its part in the creation of the largest dual-branded hotel in Europe – ‘Crowne Plaza® London – Heathrow Terminal 4’, and ‘Holiday Inn Express® London – Heathrow Terminal 4, which opened last month.

The WBS Group were contracted to carry out a full fitout of the hotels’ meetings and events facilities, which includes state of the art lighting systems, intelligent smart controls, next generation switchgear, and durable and solid mechanical hot and cold water systems.

The Crowne Plaza London ‒ Heathrow T4 is a 456,000-sq ft development with 304 bedrooms interlinked with the 457-bedroom Holiday Inn Express. They are situated only a short walk from Heathrow’s Terminal 4 with direct access to the London Underground, Heathrow Express train service and nearby motorways.

The two hotels operate under a franchise agreement with InterContinental Hotel Group and are managed by Arora Hotels, a division of the Arora Group. The construction of the hotels has been managed by Grove Developments.

“I have had the privilege of working on a number of projects in the Heathrow area as Project manager. Working on a hotel you get a real sense of achievement when it opens its doors for the first time. On the Crowne Plaza & Holiday Inn Express T4 I am especially proud of my team and the effort they have put to creating this monumental hotel. With project completion it is a testament to the good relations we have built with the client and architect to portray their vision and to ensure this building is brought to life”

Mark Harris – WBS

Throughout this project WBS has produced sustainable, long lasting product installations bespoke to the Hilton and Crowne Plaza brand.

WBS has installed energy saving LEDs and power infrastructure solutions that are resilient and efficient, in order to ensure that the building is as eco-friendly as possible, including combined heat and power and heat recovery on the ventilation system to ensure the highest classification for BREEAM.

Once the installations were complete hotel teams were given training on all the systems by the WBS experts.

Sinead Hughes, Grove Developments, said: “We are very grateful to all our contractors for their hard work and dedication in helping to create our two state-of-the-art Heathrow Terminal 4 hotels. WBS Group thought of every detail to ensure that our new meetings and events facilities include the latest in cutting-edge technology and eco-friendly infrastructure solutions and the finished result has exceeded our expectations.”